The label is a yearly duty for large offices.
Building energy intensity (BEI) is the energy a building uses in a year divided by its floor area. Under the Energy Efficiency and Conservation Act 2024 it now has legal weight. An office building of 8,000 m² or more must apply every year for an energy intensity label from the Energy Commission. From the fifth year, it must rate at least two stars.
The sources are the Energy Efficiency and Conservation Regulations 2024 (regulations 11 and 12) and the Guidelines on Ascertaining a Building and the Energy Intensity Performance of a Building, GP/ST/No.48/2024, Pind. 1/2026. Both were read on 26 Nov 2026 on the Energy Commission’s EECA page.
This is a separate duty from the one most of this site covers. The 21,600 GJ rule makes a company an energy consumer, with a Registered Energy Manager, an audit and yearly reports (the EECA guide). The building rule falls on the person in charge of a building. It can apply even when the building uses far less than 21,600 GJ.
For anyone following energy efficiency in Malaysia, this is the first rule that grades an office building against a fixed scale. The rest of this post explains the test, the sums, the bands and the dates, with worked examples.
What is building energy intensity under the EECA 2024?
It is one number per building, per year.
Building energy intensity is a performance measure that shows how much energy a building uses for each square metre of floor. The Commission’s guidelines GP/ST/No.48/2024 define it for an office as the energy used over 12 consecutive months, in gigajoules, divided by the gross floor area, giving GJ per m² a year.
The definition sits in paragraphs 5.1 and 5.2 of the guidelines. The energy is the total for the building. That means electricity, natural gas and any other energy used for heating, cooling, lighting and other building operations (paragraph 3).
Dividing by floor area is what makes buildings comparable. A 40,000 m² tower will always use more energy than a 9,000 m² block. BEI asks a fairer question: how much does each square metre cost in energy?
Why the number matters now
Before the Act, BEI was a figure that owners chose to track. The Regulations now tie it to a label and a minimum grade.
So the number moves from a design brochure into a yearly filing. A building that scores badly has a set number of years to improve, and then a floor it must stay above.
Who carries the duty
The duty falls on the person in charge of the building. It starts with a written notice from the Commission under subsection 3(4) of the Act (Regulation 11(2)).
Until that notice arrives, the clock has not started. Once it arrives, the date on it drives every deadline below. The same is true of the energy consumer duty, which is why the first week after a notice matters for both.
Which office buildings need an energy intensity label?
Two tests decide it: size and use.
An office building needs a label when its gross floor area is 8,000 m² or more and it is built or used solely for office purposes. This test comes from paragraph 4.1 of the Energy Commission’s guidelines GP/ST/No.48/2024, revised on 6 August 2026, subject to the Commission’s further determination.
The guidelines were revised and dated 6 August 2026. St.gov.my lists them as issued on 5 November 2026. The test in paragraph 4.1 has two parts:
- a gross floor area (GFA) of 8,000 m² or more; and
- a building built or used solely for office purposes.
Both are subject to the Commission’s further determination. That determination looks at the building’s specification and where the energy supplied to it is metered.
What about hotels, hospitals and malls?
The guidelines so far set criteria for office buildings only. They note that other factors may be used for other types of building, such as beds in a healthcare facility or rooms in a hotel (paragraph 3).
So a hotel or hospital owner should read this as a signal, not a current duty. The office rule is the one in force today.
Common mistakes on coverage
- Assuming low energy use means no duty. The building test is about floor area and use, not the 21,600 GJ line.
- Counting only your own floors. The metering rules below can pull tenant floors into the building’s total.
- Waiting to be sure. If your office is near 8,000 m², measure the GFA now. Questions go to the Commission’s building mailbox, pic-building@st.gov.my (st.gov.my EECA page, read 26 Nov 2026).
What counts as gross floor area for the BEI?
Floor area is the bottom half of the sum.
Gross floor area is measured between the external sides of the walls, or the centres of party walls, under paragraph 4.2 of the Commission’s guidelines GP/ST/No.48/2024. Car parks, outside parking, upper-floor stairs and lift shafts, loading waits, open gardens and public walkways are left out of the figure.
The full list of exclusions in paragraph 4.2 is:
- parking spaces and their circulation areas, including mechanical or electrical spaces inside the car park;
- open or covered parking outside the building;
- staircases and lift shafts on floors other than the ground floor or lobby;
- waiting areas for commercial vehicles unloading goods;
- rooftop or podium gardens and recreation areas in open or semi-open spaces;
- pedestrian pathways connected to the building or a transit station, and public walkways through it.
The exclusions matter both ways. They decide whether a building crosses 8,000 m². They also set the floor area used to work out the BEI.
How the meters set the boundary
The metering decides the boundary (paragraph 4.3). Three cases are set out:
| Situation | What counts as the building |
|---|---|
| One supply meter feeds two office blocks in one compound | Both blocks count as one building |
| Each tenant has its own supply meter in one building | The floors of all the tenants supplied are included |
| The owner distributes power to tenants as a public installation licensee | The tenants’ floors are included too |
In practice, this means the building’s energy and its floor area must cover the same space. If a tenant’s floors are in the GFA, that tenant’s energy belongs in the total as well.
What to prepare for the floor area
- Approved building plans with floor-by-floor areas.
- A marked list of the excluded spaces, such as car park levels.
- A meter map: which supply meter serves which block, floor or tenant.
How do you calculate building energy intensity in GJ per m²?
Convert every source to gigajoules, then divide.
To calculate building energy intensity, add 12 months of energy from every source in gigajoules, then divide by gross floor area. The Commission’s guidelines GP/ST/No.48/2024, Appendix A, convert electricity at 0.0036 GJ per kWh and natural gas at 0.047233 GJ per m³.
Use the Commission’s factors from Appendix A of the guidelines:
| Energy | Factor |
|---|---|
| Electricity | 0.0036 GJ per kWh |
| Solar photovoltaic | 0.0036 GJ per kWh |
| Chilled water | 0.01266 GJ per refrigeration ton hour |
| Natural gas | 0.047233 GJ per m³ |
| LPG | 0.045544 GJ per kg |
Energy from rooftop solar is counted at the same factor as grid electricity. Figure 6 of the guidelines shows a building with both.
The electricity factor is the familiar 3.6 MJ per kWh. That also gives a quick way back: 1 GJ/m² equals about 277.8 kWh/m².
Example 1: an all-electric office tower
An office tower of 20,000 m² GFA uses 3,000,000 kWh of electricity in a year and nothing else.
- Energy: 3,000,000 × 0.0036 = 10,800 GJ.
- BEI: 10,800 ÷ 20,000 = 0.54 GJ/m², or 150 kWh/m² a year.
The tower is well under 21,600 GJ, so it is not an energy consumer. It still needs a label.
Example 2: an office with rooftop solar
A 10,000 m² office takes 1,500,000 kWh from the grid and 200,000 kWh from its own rooftop solar in a year.
- Energy: (1,500,000 + 200,000) × 0.0036 = 6,120 GJ.
- BEI: 6,120 ÷ 10,000 = 0.612 GJ/m², or 170 kWh/m² a year.
Because solar is in the total at the same factor, it does not shrink the BEI by itself in this sum. What lowers the BEI is using less energy in the building.
Example 3: an office with gas and chilled water
A 25,000 m² office uses 2,000,000 kWh of electricity, 1,000,000 refrigeration ton hours of chilled water and 20,000 m³ of natural gas.
- Electricity: 2,000,000 × 0.0036 = 7,200 GJ.
- Chilled water: 1,000,000 × 0.01266 = 12,660 GJ.
- Natural gas: 20,000 × 0.047233 = about 945 GJ.
- Total: about 20,805 GJ. BEI: about 0.832 GJ/m², or about 231 kWh/m² a year.
This building would be graded on the separate table for offices with a chilled water supply, shown in the next section.
Common mistakes in the sum
- Leaving out a source. Chilled water and solar are easy to miss because they do not come on the main electricity bill.
- Mixing periods. The guidelines ask for 12 consecutive months, so every source must cover the same months.
- Using a different floor area. The GFA must follow the exclusions and the meter boundary above.
Not sure your sums or floor area are right? Ask for a price through the form. The 12 months of bills you have are enough to start.
What star rating does an office building need?
Two stars is the floor from year five.
An office building must reach at least two stars every year from the fifth year after its first label, under Regulation 12 of the Energy Efficiency and Conservation Regulations 2024. For an ordinary office, the Commission’s guidelines set two stars at over 160 to 200 kWh/m² a year.
The guidelines give two tables in section 6. One is for ordinary office buildings. The other is for office buildings with a chilled water supply.
| Stars | Office building (kWh/m² a year) | Office with chilled water supply (kWh/m² a year) |
|---|---|---|
| 5, very efficient | 90 or less | 190 or less |
| 4, efficient | over 90 to 110 | over 190 to 240 |
| 3, moderately efficient | over 110 to 160 | over 240 to 340 |
| 2, slightly efficient | over 160 to 200 | over 340 to 420 |
| 1, least efficient | over 200 | over 420 |
The same bands in GJ/m² a year for an ordinary office: 5 stars at 0.324 or less, 4 stars to 0.396, 3 stars to 0.576, 2 stars to 0.720, 1 star above 0.720.
The label itself runs from 1 star to 5 stars, in the design shown in section 7 of the guidelines.
Where the examples land
| Example | BEI (kWh/m² a year) | Table | Stars |
|---|---|---|---|
| All-electric tower, 20,000 m² | 150 | Office building | 3 |
| Office with solar, 10,000 m² | 170 | Office building | 2 |
| Office with chilled water, 25,000 m² | about 231 | Office with chilled water supply | 4 |
The tower at 150 kWh/m² sits in the 3-star band. If its BEI rose above 200 kWh/m², it would drop to 1 star. It would then fail the two-star floor once that applies.
The solar office at 170 kWh/m² passes, but with little room. A rise of just over 30 kWh/m² would take it below the floor.
How far does a 1-star office have to go?
Take a 20,000 m² ordinary office at 220 kWh/m² a year. That is 4,400,000 kWh and 1 star.
To reach 200 kWh/m², it must cut 20 kWh/m². Across 20,000 m², that is 400,000 kWh a year, or about 9% of its use. The building has until the fifth year after its first label to get there.
When are the label deadlines and fees due?
Every date runs from the Commission’s notice.
The first label application is due within 30 days after one year from the Commission’s notice, under Regulation 11(2) of the Energy Efficiency and Conservation Regulations 2024. Later applications are due within 30 days before the label expires. The Schedule sets the fee at RM100 a year, plus RM100 if late.
From regulations 11 and 12 of the Energy Efficiency and Conservation Regulations 2024:
| Step | When |
|---|---|
| First label application | Within 30 days after one year from the Commission’s notice |
| Each later application | Within 30 days before the current label expires |
| Label validity | Up to one year, to the date shown on the label |
| At least two stars | Every year, from the fifth year after the first label |
Applications are made electronically, with the fee and any information the Commission asks for. The Schedule to the Regulations sets the fee at RM100 a year and a late fee of RM100 (items 1 and 2).
What the first year is for
The first application comes a year after the notice, plus 30 days. That year is the 12 consecutive months the BEI needs.
So the year is not a waiting period. It is the time to set up meter readings, confirm the GFA and check that every energy source is captured.
A simple calendar
- Day of the notice: write down the date. Every deadline counts from it.
- First 12 months: collect monthly readings for every source.
- One year plus 30 days: first application and fee due.
- Each year after: apply within 30 days before the label expires.
- Fifth year after the first label: two stars or better, every year.
What should a building owner do in the first year?
Measure first, then plan the fixes.
A building owner should measure the gross floor area, pull 12 months of data for every energy source, work out the BEI and find its band. The Energy Commission’s two-star floor applies from the fifth year after the first label, so a 1-star office has about four years to improve.
The five steps
- Measure the GFA with the exclusions above, and match it to the supply meters.
- Pull 12 months of energy data for every source, including chilled water and solar.
- Work out the BEI and find your band. Two stars is the floor from year five.
- List the big loads, such as the chiller plant, air handling and lighting, with their run hours and set points. The energy audit guide covers what an audit measures.
- Check whether you are also an energy consumer. A large office or mixed site may cross 21,600 GJ as well. In that case both sets of duties apply (the EECA guide).
When a building has both duties
At 0.0036 GJ per kWh, 21,600 GJ is 6,000,000 kWh of electricity. A 40,000 m² office at 150 kWh/m² a year uses exactly that.
Such a building has a label duty and may also have energy consumer duties. The consumer side needs a Registered Energy Manager, which has its own training route (how to train as an energy manager).
Who can help with the work
The Commission keeps public lists of registered firms and people. Its ESCO list is on st.gov.my. Registered energy auditors appear on the MySTEE certificate list.
This site’s list of companies and ESCO guide explain who does what. Check any firm against the Commission’s own lists before you sign.
Objections owners raise
- “Our tenants pay their own bills.” If their floors are inside the meter boundary, their energy and area count toward the building.
- “We already have solar.” Solar is counted in the total, so it does not lower the BEI by itself in this sum.
- “Year five is far off.” The improvement has to show in 12 months of real data, so the work must be done before that year starts.
Where can you read the BEI rules yourself?
All of it sits on the Commission’s pages.
The rules sit in three places: the Energy Efficiency and Conservation Act 2024, its Regulations 2024 (regulations 11 and 12 and the Schedule), and the Commission’s guidelines GP/ST/No.48/2024, Pind. 1/2026. The Energy Commission’s EECA page lists these guidelines among seven guidelines and three guides under the Act.
The Commission’s EECA page lists the Guidelines on Ascertaining a Building and the Energy Intensity Performance of a Building (read 26 Nov 2026). The Act and regulations are also on its legislation page.
The EECA itself applies to Peninsular Malaysia and the Federal Territory of Labuan. It came into force on 1 January 2025 (st.gov.my, read 26 Nov 2026).
What each document tells you
| Document | What it covers for buildings |
|---|---|
| The Act, subsection 3(4) | The Commission’s power to notify a building’s person in charge |
| Regulations 2024, regulation 11 | The label application and its timing |
| Regulations 2024, regulation 12 | The two-star floor from the fifth year |
| Regulations 2024, Schedule items 1 and 2 | RM100 fee and RM100 late fee |
| Guidelines GP/ST/No.48/2024, Pind. 1/2026 | Office test, GFA, metering, BEI sum, factors, star bands, label design |