The EECA 2024 starts with a notice.
The Energy Efficiency and Conservation Act 2024 (Act 861), known as the EECA 2024, came into force on 1 January 2025. In Malay it is the Akta Kecekapan dan Konservasi Tenaga 2024. It applies to Peninsular Malaysia and the Federal Territory of Labuan (section 1(3) of the Act).
On the same day the old electricity rule, the Efficient Management of Electrical Energy Regulations 2008, was repealed (Energy Commission, EECA 2024 page, read 26 Nov 2026).
This guide answers the questions a facility manager asks first. Is my site covered? What must we do, and by when? What happens if we do not?
What is the EECA 2024, and who does it cover?
The EECA 2024 is a federal law that makes large energy users manage and report their energy. The Energy Efficiency and Conservation Regulations 2024 (P.U.(A) 466/2024) set the line at 21,600 GJ used in 12 consecutive months, and the Energy Commission sends a written notice to each site it finds over that line.
The Act calls a covered site an energy consumer. That is a person who, for an activity, business or trade, is supplied with energy or energy resources and consumes them (section 2).
The Act applies to an energy consumer whose use over 12 consecutive months equals or exceeds the threshold the Minister sets (section 3(1)(a)). Regulation 3 sets that threshold at 21,600 gigajoules. The regulations were gazetted on 31 December 2024.
Who decides that you are covered?
The use is counted for an activity carried out in one place (section 3(5)). The Energy Commission decides whether you are covered, from the information it holds. It then sends you a written notice (sections 3(2) and 3(3)).
Your duties run from the date on that notice. Until it arrives, no deadline has started. Once it arrives, every deadline in this guide counts from it.
What kind of sites are these?
In practice, 21,600 GJ is a big site. Think of factories, malls, hospitals, data centres, universities and large office towers. A small shop or a home is far below the line, and the Act does not cover homes.
How is the 21,600 GJ threshold counted?
Every fuel counts, added together. The Energy Commission’s Guidelines on Ascertaining Energy Consumer (GP/ST/No.44/2024, amended 10 July 2026) convert each energy the site receives into GJ and sum them. Electricity converts at 0.0036 GJ per kWh, so 21,600 GJ on electricity alone is 6,000,000 kWh a year.
The guideline (read 26 Nov 2026) says a site’s use is measured at each point where energy is received from a supplier. Solar the site generates for itself is added too. Each one is converted into GJ with the coefficients in Appendix A, then summed.
Which coefficients will you use most?
These are the figures from Appendix A of the guideline:
| Energy or fuel | Coefficient |
|---|---|
| Electricity | 0.0036 GJ per kWh |
| Natural gas | 1.055 GJ per MMBtu, or 0.047233 GJ per m3 |
| LPG | 0.045544 GJ per kg |
| Chilled water bought in | 0.01266 GJ per RTh |
| Steam at 10 bar | 2.7771 GJ per tonne |
| Biodiesel | 0.03564 GJ per litre |
| Palm kernel shell | 20.1 GJ per tonne |
| Solar photovoltaic | 0.0036 GJ per kWh |
What counts, and what does not?
What counts is what the Act’s two schedules list. The First Schedule lists the energy resources. These are coal and coke types, LNG, butane, propane, natural gas, ethane, methane, solar photovoltaic and solar thermal, biogas, biodiesel, charcoal and the palm and wood fuels.
The Second Schedule lists the energy: electricity, chilled water, steam and hot water. Petrol and diesel are not on either list, so they do not count toward the line.
The guideline also leaves some energy out of the count:
- energy bought to sell on or pass to other people, such as power a building owner passes to tenants who control their own use (the count is net of what goes out);
- fuel used as a feedstock, such as ethane turned into ethylene;
- energy made from waste heat recovery;
- solar power exported to the grid.
Two plants of related companies in the same compound may be counted as one energy consumer. Plants separated by another owner’s factory stay separate.
What does the Commission’s own example show?
The guideline’s example is Factory A. In 2025 it used 8,323,446 kWh of electricity, which is 29,964.41 GJ. It also used 17,287 MMBtu of natural gas, which is 18,237.79 GJ.
The total is 48,202.19 GJ. Factory A is over the line. It is also under 50,000 GJ, which matters later for the type of manager it needs.
A worked example near the line
Take a plant that uses 450,000 kWh of electricity a month. Over 12 months that is 5,400,000 kWh. At 0.0036 GJ per kWh, it is 19,440 GJ. On electricity alone, the plant is under the line.
Now add 60,000 kg of LPG for its ovens. At 0.045544 GJ per kg, that is 2,732.64 GJ. The total is 22,172.64 GJ. The plant is over the line once the gas is added.
The same plant may also run diesel generators. That diesel does not change the answer either way, because diesel is on neither list.
A quick check for your site
- Add up 12 consecutive months of electricity in kWh and multiply by 0.0036.
- Add any natural gas, LPG, steam or chilled water bought in, each with its coefficient.
- Take out any power passed on to tenants who control their own use.
- Compare the total with 21,600 GJ.
The converter on the home page does the sum for you.
Does the EECA 2024 cover office buildings too?
Yes, through a separate duty. Under regulations 11 and 12 of the Energy Efficiency and Conservation Regulations 2024 and the Commission’s building guidelines, an office building of 8,000 m² or more gross floor area must apply every year for an energy intensity label. From the fifth year it must rate at least two stars.
This duty is separate from the 21,600 GJ rule. A tower can be well under the GJ line and still need a label. The Commission’s guidelines on buildings are GP/ST/No.48/2024, Pind. 1/2026.
The duty starts with a written notice to the person in charge of the building, under subsection 3(4) of the Act (regulation 11(2)).
How does the label work in numbers?
Building energy intensity (BEI) is the energy used over 12 months divided by the gross floor area. Take an office tower of 20,000 m² that uses 3,000,000 kWh a year and nothing else.
That is 3,000,000 x 0.0036 = 10,800 GJ. Its BEI is 10,800 / 20,000 = 0.54 GJ/m², or 150 kWh/m² a year. It is not an energy consumer, but it still needs a label.
The guide to the building energy intensity label sets out the star bands and the yearly steps.
What must an energy consumer do under the EECA, and by when?
The clock starts on the day the Energy Commission’s notice is dated. Under the Energy Efficiency and Conservation Regulations 2024, the site must appoint a Registered Energy Manager within 3 months, develop an energy management system within 1 year of that appointment, and send a first energy audit report within 1 year of the notice.
The Commission lists the deadlines on its energy consumer page (read 26 Nov 2026):
| Duty | Due | Where it is set |
|---|---|---|
| Appoint a Registered Energy Manager and tell the Commission | within 3 months of the notice | regulation 4 |
| Develop an energy management system | within 1 year of the first manager’s appointment | regulation 8 |
| First energy audit report, by a Registered Energy Auditor | within 1 year of the notice, then every 5 years | regulation 10 |
| Energy efficiency and conservation report | within 30 days after the first year from the manager’s appointment, then every year | regulation 9 |
| Tell the Commission the manager has left | within 14 days, and appoint a new one within 3 months | regulation 7 |
What does that look like on a calendar?
The Commission’s own example: a notice dated 1 January 2026 means the energy manager is due by 31 March 2026.
Carry the same notice forward. Say the manager is appointed on 15 March 2026. The energy management system is then due within one year of that day, by 15 March 2027.
The first yearly report is due within 30 days after the manager’s first year, so by about 14 April 2027. The first energy audit report runs from the notice, not the appointment, so it is due within one year of 1 January 2026.
Which type of energy manager does the site need?
The manager is normally one of your own employees (regulation 4). A manager from outside is allowed for up to 3 years from the notice. After that, the site must appoint one of its own (regulation 6).
Sites between 21,600 and 50,000 GJ need a first type manager. Sites above 50,000 GJ need a second type (regulation 5). Factory A, at 48,202.19 GJ, would need a first type manager.
Hiring a Registered Energy Manager explains both types. The Commission keeps its register of managers and auditors on its registration page.
Can a site skip a later audit?
After the first audit report, a site may ask the Commission to excuse it from the next ones. It must show it has made significant energy savings (section 9(3)). The request goes in within the first three months of the fifth year (regulation 10(2)).
Got a notice and only three months? Send your site and notice date through the quote form. The notice date and a year of bills are enough to start.
What must the energy manager and the yearly report cover?
Section 5(2) of the Energy Efficiency and Conservation Act 2024 sets four duties for the Registered Energy Manager: analyse the energy data, run the energy management system, prepare and vouch for the yearly report, and advise on savings. Section 7(1) sets what that report holds, and the Commission’s 13 November 2026 guidelines set its format.
The manager’s duties in section 5(2), in plain words:
- collect and analyse the site’s energy data;
- see that the energy management system is put in place and followed;
- prepare the energy efficiency and conservation report and vouch for its accuracy;
- advise on other ways to save energy.
What goes in the yearly report?
Section 7(1) sets what the yearly report holds:
- a description of the energy management system;
- how much energy and fuel was used, and for what;
- the measures proposed;
- the measures done, and those still to do.
The Commission’s Guidelines on Energy Efficiency and Conservation Report, issued 13 November 2026, set the format.
Who does what at the site?
The manager does the analysis and signs the report. A Registered Energy Auditor does the energy audit every five years. The energy consumer is the one fined if an appointment or a report is missed.
The guides on each duty: the energy audit, the Registered Energy Manager and ESCO contracts, for sites that pay for savings work out of the savings.
What should you prepare first?
- 12 consecutive months of electricity bills, in kWh;
- the gas, LPG, steam and chilled water invoices for the same months;
- the date on the Commission’s notice;
- a list of staff who could hold the manager’s registration;
- any old EMEER 2008 records, if the site was covered before.
The post on the day the notice arrives walks through the first week.
What are the fines for not complying with the EECA 2024?
Most EECA 2024 offences carry a fine of up to RM50,000 on conviction. That covers not appointing a Registered Energy Manager (section 5(3)), not putting in an energy management system, not appointing an auditor and not sending in the reports. The Energy Commission’s FAQ gives the same ceiling.
The fines are in the Act itself (read 26 Nov 2026). Each is the most a court can impose on conviction:
| Offence | Section | Fine up to |
|---|---|---|
| Not appointing a Registered Energy Manager | 5(3) | RM50,000 |
| Not developing and putting in place an energy management system | 6(3) | RM50,000 |
| An energy management system not built to the guidelines | 6(4) | RM20,000 |
| Not sending in the energy efficiency and conservation report | 7(4) | RM50,000 |
| Not appointing a Registered Energy Auditor for the audit | 8(4) | RM50,000 |
| Not sending in the energy audit report | 9(10) | RM50,000 |
| Not telling the Commission within 14 days that the manager left | regulation 7(4) | RM10,000 |
| The manager failing in his own duties or report | 5(4), 7(3) | RM20,000 |
What happens before a court case?
A prosecution needs the Public Prosecutor’s written consent (section 60). Before it gets that far, the Commission may offer to compound the offence for up to half the maximum fine (section 61).
So an offence with a RM50,000 ceiling can be compounded for up to RM25,000. The Energy Efficiency and Conservation (Compounding of Offences) Regulations 2024, P.U.(A) 467/2024, list the offences above as ones that can be compounded.
Can directors be charged?
Yes. When a company offends, its directors, managers and similar officers can be charged with it (section 62). The duty is not only the energy manager’s problem.
What did the EECA 2024 replace, and where does it not apply?
The EECA 2024 replaced the Efficient Management of Electrical Energy Regulations 2008, which covered electricity only and were repealed on 1 January 2025. The Act does not apply in Sabah or Sarawak. Sabah keeps its own 2024 regulations, covering installations using 3,000,000 kWh or more in up to six months.
What changed from EMEER 2008?
EMEER 2008 was made under the Electricity Supply Act 1990 and counted electricity only. The new Act counts every listed fuel together, in GJ.
An electrical energy manager registered under the old Act counts as a Registered Energy Manager until that certificate expires. That holds as long as he has applied under the new Act (section 71). The guide on what changed from the 2008 rule sets the old rule beside the new one.
What applies in Sabah?
The Energy Commission of Sabah (ECoS) keeps its own Efficient Management of Electrical Energy Regulations 2024. They have been in force from 3 January 2024, under the Electricity Supply Enactment 2024.
They cover an installation using 3,000,000 kWh or more over any period of up to six consecutive months (regulation 3, read on ecos.gov.my, 26 Nov 2026). A site in Sabah deals with ECoS, not with the Energy Commission in Putrajaya.
What mistakes do sites make with the EECA 2024?
One easy mistake is counting electricity only. The Energy Commission’s guideline adds natural gas, LPG, steam and chilled water, so a site using 5,400,000 kWh a year (19,440 GJ) can still pass 21,600 GJ. Other mistakes are counting diesel, missing the 3-month deadline and forgetting the 14-day notice.
Counting the wrong energy
Diesel and petrol are not on the Act’s lists, so adding them can push a site over the line on paper when it is not. Leaving out gas or bought-in chilled water does the opposite.
Power passed on to tenants who control their own use comes off the count. A landlord who forgets that may think it is covered when it is not.
Counting from the wrong date
Every deadline runs from the notice, except the management system and the yearly report, which run from the manager’s appointment. Mixing the two up moves a due date.
Treating the manager as a one-off hire
An outside manager is allowed for only 3 years from the notice. If the manager leaves, the Commission must hear within 14 days, and a new one must be in place within 3 months. Missing the 14 days alone can bring a fine of up to RM10,000.
Where can you read the EECA 2024 rules yourself?
The Energy Commission publishes the Energy Efficiency and Conservation Act 2024, the 2024 regulations and its guidelines on one EECA page at st.gov.my. The Act is Act 861, the regulations are P.U.(A) 466/2024, and the compounding rules are P.U.(A) 467/2024. Questions from energy consumers go to enc@st.gov.my.
The Commission’s EECA 2024 page holds the Act, the regulations and the guidelines. The legislation library holds the full texts.
Read the guideline on ascertaining an energy consumer before you do the sum. Read the Act’s schedules before you decide what to count. Then check the date on your notice, and work forward from it.