An ESCO is paid from what you save.
An energy service company, or ESCO, designs and puts in work that cuts a site’s energy use, such as a chiller retrofit, new lighting or better controls. It is paid out of the savings. For anyone searching ESCO Malaysia, the key facts are simple: the contract is an energy performance contract, and the Energy Commission (Suruhanjaya Tenaga) keeps the register.
On 26 Nov 2026 that register, on the Commission’s MySTEE portal, listed 16 firms with a current certificate. This page explains how the contracts work, how savings are measured, and how to check a firm.
What is an ESCO in Malaysia?
An ESCO (energy service company) is a firm that provides energy efficiency services and is paid, in part or in full, from the savings. The Energy Commission’s MySTEE portal lists audits, consultancy, design, financing, installation and energy performance contracting among its services, and on 26 Nov 2026 it named 16 certified ESCOs.
The Energy Commission describes an ESCO as a company that provides energy efficiency services. Those include energy audits, technical consultancy, system design, project financing, putting in energy saving measures, and managing energy performance contracting projects (MySTEE, ESCO introduction, read 26 Nov 2026).
What sets an ESCO apart from a contractor is how it is paid. A contractor is paid for the work, whether or not the bill falls afterwards.
An ESCO is paid, in part or in full, from the energy the work saves. So it carries some of the risk that the savings do not come.
What kind of work an ESCO takes on
The work is usually in the systems that use the most energy. On a large site those are the chillers, air handling, lighting, compressed air, motors and pumps, and boilers or other thermal plant.
The Commission’s energy audit guidelines name the same systems as significant energy uses. That is no accident: the audit finds the measures, and the ESCO often puts them in.
Who an ESCO contract suits
An ESCO contract suits a site with steady energy use, a building it expects to keep for years, and savings measures that cost more than its maintenance budget can carry.
It suits a site less well if it plans to move soon, sell the building, or change production in ways that make a baseline hard to hold.
How does an energy performance contract work?
Two forms cover most contracts.
An energy performance contract ties the ESCO’s pay to measured savings. Under guaranteed savings the site usually funds the work and the ESCO pays any shortfall. Under shared savings the ESCO usually funds it and takes a share for an agreed term. The Energy Commission’s MySTEE portal lists performance contracting among ESCO services.
The two common forms differ in who pays up front and who carries which risk.
| Guaranteed savings | Shared savings | |
|---|---|---|
| Who pays for the work | Usually the site, from its own funds or a loan | Usually the ESCO |
| What the ESCO promises | A level of savings; it pays the gap if the site falls short | A share of what is saved |
| What the site keeps | The savings above the guarantee | Its share of the savings for the term |
| Who carries the risk | The ESCO, for savings that fall short; the site, for any loan | The ESCO, for both the money spent and the savings |
| Suits a site that | Can fund the work and wants to keep most of the savings | Wants no money up front and accepts a smaller share |
Which form suits a site depends on three things. Can it pay for the work up front? How does it treat debt on its books? How much risk does it want to keep?
An example in numbers
Take a site with an agreed baseline of 8,000,000 kWh of electricity a year. At the Energy Commission’s coefficient of 0.0036 GJ per kWh, that is 28,800 GJ, well over the 21,600 GJ line.
Say the ESCO’s work saves 10%, or 800,000 kWh a year. That is 2,880 GJ.
Under a shared savings contract with, for example, a 70/30 split in the ESCO’s favour, the ESCO’s share is 560,000 kWh of savings each year, priced at the rate the contract sets. The site keeps the value of 240,000 kWh. The split here is only an illustration; each contract sets its own.
Under a guaranteed savings contract that guarantees, say, 700,000 kWh, the site keeps all 800,000 kWh of savings and pays off the work itself. If only 600,000 kWh is measured, the ESCO pays the value of the 100,000 kWh gap.
Common mistakes with the contract form
- Choosing shared savings only because it needs no money up front, without pricing what the ESCO’s share costs over the full term.
- Signing a guaranteed savings contract without reading how the guarantee is measured, so a shortfall is hard to prove.
- Forgetting that a loan for guaranteed savings sits on the site’s books, while the risk of the savings sits with the ESCO.
How are ESCO savings measured and verified?
Every ringgit in the contract rests on the baseline.
ESCO savings are measured against an agreed baseline of at least 12 months, adjusted for changes in hours, weather or production. The Energy Commission’s Guidelines on Energy Audit Report already ask for a 12-month baseline with a regression of energy against what drives it, so an audited site has much of this ready.
The whole contract stands on measurement and verification. Before the work, the ESCO and the site agree a baseline: how much energy the site used, and under what conditions.
After the work, savings are measured against that baseline. The baseline is adjusted for changes such as longer opening hours, a hotter year or more production. Without that adjustment, a busy year could hide real savings, and a quiet year could invent savings that never happened.
What to agree in writing
- the baseline period, at least 12 months, and the meters it uses;
- what drives energy use at the site (production, floor area, operating hours, weather) and how the baseline is adjusted for each;
- who reads the meters, how often, and who checks the figures;
- the price per kWh used to turn energy saved into ringgit, and what happens when the tariff changes;
- what happens if the figures are disputed.
Where the audit helps
A site under the EECA 2024 already has much of this. Its energy audit sets a 12-month baseline with a regression of energy against what drives it.
The audit report also lists each saving measure with its estimated yearly savings in GJ and RM, its cost and its simple payback (Guidelines on Energy Audit Report, read 26 Nov 2026). That table is often where an ESCO’s proposal starts.
The audit must cover at least 80% of the site’s connected load, and it includes a load profile of the main incomer over at least 7 days. Those records give the ESCO and the site a shared starting point, rather than two sets of figures.
Common mistakes with measurement
- Using a baseline shorter than 12 months, so one season sets the figures for the whole contract.
- Leaving out a driver such as production volume, then arguing about savings in a busy year.
- Fixing the tariff in the contract without saying what happens when it changes.
- Letting only one side read the meters, with no one checking the figures.
How long does an energy savings performance contract run?
The term follows the payback.
An energy savings performance contract runs for a term set in the contract, long enough for the savings to pay for the work. The Energy Commission’s audit guidelines ask each measure’s cost and simple payback to be stated, so the audit report gives a first view of how long a fair term should be.
No rule fixes the term. It is set in the contract, and it depends on how long the savings take to pay for the work, plus the ESCO’s margin under shared savings.
A measure with a short simple payback in the audit, such as a lighting change, needs a short term. A chiller replacement with a long payback needs a longer one. A contract bundling both may run as long as the slowest measure.
What to ask about the term
- the term it proposes, and how it worked that out;
- who owns the equipment during the term and at the end;
- who maintains it, and who pays if it breaks;
- what happens if the site moves, sells the building or changes production.
When the term ends
Agree the end on day one. Does the equipment pass to the site? Is there a final payment? Who keeps the maintenance records, and do the warranties carry over?
A site that cannot answer these at the start may find, years later, that it owns plant it never planned to run.
Weighing an ESCO offer for your site? Send your yearly energy use and what the ESCO proposes through the quote form. Your monthly bill is enough to start.
Which ESCOs are registered with the Energy Commission?
Check the MySTEE list, not a brochure.
On 26 Nov 2026 the Energy Commission’s MySTEE List of ESCO held 16 firms, each with a one-year certificate numbered ESCO-2026-0001 to ESCO-2026-0016, all active. The Commission runs an eligibility review against technical, competency and governance requirements before it recognises a company as an ESCO under the EECA 2024.
The Energy Commission keeps the list. With the Energy Efficiency and Conservation Act 2024 in force, it reviews companies seeking recognition as an ESCO against technical, competency and governance requirements (MySTEE, ESCO introduction, read 26 Nov 2026).
On 26 Nov 2026 the List of ESCO on MySTEE held 16 firms, each with a one-year certificate and all active:
| Firm | Certificate | Valid until |
|---|---|---|
| Elco Energy Solutions Sdn Bhd | ESCO-2026-0001 | 6 Sep 2027 |
| iBright Great Resources Sdn Bhd | ESCO-2026-0002 | 6 Sep 2027 |
| Syrefl Energy Sdn Bhd | ESCO-2026-0003 | 7 Sep 2027 |
| ATECH Energy Sdn Bhd | ESCO-2026-0004 | 7 Sep 2027 |
| GBI Innovation Sdn Bhd | ESCO-2026-0005 | 16 Sep 2027 |
| Promserv Engineering Sdn Bhd | ESCO-2026-0006 | 17 Sep 2027 |
| IETCO Sdn Bhd | ESCO-2026-0007 | 17 Sep 2027 |
| AG Engineering Works (Malaysia) Sdn Bhd | ESCO-2026-0008 | 20 Sep 2027 |
| G Energy Integrated Services Sdn Bhd | ESCO-2026-0009 | 28 Sep 2027 |
| Sky Ingenium Sdn Bhd | ESCO-2026-0010 | 2 Nov 2027 |
| Inventive Energy Asia Sdn Bhd | ESCO-2026-0011 | 2 Nov 2027 |
| EAG Consulting Sdn Bhd | ESCO-2026-0012 | 2 Nov 2027 |
| Energy Automation Management Sdn Bhd | ESCO-2026-0013 | 2 Nov 2027 |
| Alka System | ESCO-2026-0014 | 3 Nov 2027 |
| VSD Automation Sdn Bhd | ESCO-2026-0015 | 3 Nov 2027 |
| Fabulous Sunview Sdn Bhd | ESCO-2026-0016 | 5 Nov 2027 |
The older list on st.gov.my
The Commission’s main site also carries an older List of Energy Service Company (ESCO) with 409 names and no certificate numbers or dates (st.gov.my, read 26 Nov 2026).
A firm on that list is not on the MySTEE list unless it holds one of the certificates above. When a proposal says “registered ESCO”, ask for the certificate number and check it on MySTEE.
Check on the day you sign
New certificates are being added: the 16 were issued between 7 Sep and 6 Nov 2026. Each runs for one year, so a firm certified today needs a new certificate next year.
Check the list again on the day you sign, and note the certificate’s end date in the contract. The companies page lists every firm holding a current ESCO certificate, taken from the same MySTEE register.
Does a site under the EECA 2024 still need an energy manager if it hires an ESCO?
Yes. The duties stay with the site.
Yes. Under the Energy Efficiency and Conservation Act 2024, a site that used 21,600 GJ or more in 12 consecutive months needs a Registered Energy Manager within 3 months of the Energy Commission’s notice, an energy management system within a year, a yearly report and an energy audit, whatever its ESCO contract says.
An ESCO contract does not replace the duties under the Act. A site over the line still needs its Registered Energy Manager within 3 months of the Commission’s notice.
It also needs an energy management system within a year of that appointment, its yearly report and its energy audit (Energy Commission, energy consumer page, read 26 Nov 2026). The first audit report is due within 1 year of the notice, then every 5 years.
How the three roles fit together
| Role | What it does | Who it answers to |
|---|---|---|
| Registered Energy Auditor | Finds the saving measures and prices them in the audit report | The energy consumer, which sends the report to the Commission |
| ESCO | Puts some of the measures in and is paid from the savings | The site, under the contract |
| Registered Energy Manager | Tracks the savings through the year and reports them | The energy consumer, which files the yearly report |
The audit finds the measures. The ESCO puts some of them in. The energy manager tracks what they save and puts it in the yearly report. If the notice has just arrived, the first week after the notice sets out what to do first.
Will the savings take a site below the line?
Often not. The Commission’s own worked example, Factory A, used 8,323,446 kWh of electricity (29,964.41 GJ) and natural gas worth 18,237.79 GJ in 2025, a total of 48,202.19 GJ.
If an ESCO cut Factory A’s electricity by 10%, it would save about 832,345 kWh, or 2,996.44 GJ. The total would fall to 45,205.75 GJ, still more than twice the 21,600 GJ line.
Savings still matter under the Act. After the first audit report, a site may ask the Commission to excuse it from the next audits if it shows significant energy savings (section 9(3)). The request goes in within the first three months of the fifth year (regulation 10(2)).
What counts in the GJ
Only what the Act’s two schedules list counts toward the line: electricity, chilled water, steam and hot water, and energy resources such as natural gas, LPG and the other First Schedule fuels. Petrol and diesel are on neither list, so savings on those do not change the site’s GJ total.
Who signs an energy performance contract, and what should you ask first?
The finance head belongs in the room early.
An energy performance contract runs for years and moves money between the site and the ESCO, so the managing director or finance head usually signs it. Before signing, ask for the firm’s certificate number on the Energy Commission’s MySTEE list, such as ESCO-2026-0001, and check the date it runs to.
Because the contract runs for years, it is usually signed by the managing director or the finance head, with the head of engineering behind it.
Bring finance in when the baseline is set, not at the end. The baseline and the tariff clause decide what the site pays.
Who does what before signing
- Head of engineering or facility manager: checks the measures against the audit, and the baseline against the meters.
- Finance head: checks the term, the share or guarantee, the tariff clause, and how any loan sits on the books.
- Registered Energy Manager: checks that the measurement plan fits the energy management system and the yearly report.
- Managing director: signs, once the other three agree.
What to ask before you sign
- Its certificate number on the Commission’s MySTEE ESCO list, and the date it runs to.
- Guaranteed or shared savings, and why for your site.
- The baseline, how it is adjusted, and how savings will be measured and checked.
- The tariff used to price the savings, and what happens when it changes.
- The term, and who owns and maintains the equipment during and after it.
- Sites of a similar size it has done, with the savings measured.
What to prepare before you ask
- 12 months or more of energy bills, electricity and any fuel on the Act’s lists;
- the latest energy audit report, if there is one, with its table of measures;
- operating hours, production figures and floor area for the same months;
- the date of the Commission’s notice, if one has arrived.
A firm that cannot answer questions 1 and 3 clearly is not ready to sign a contract that depends on them.
Where can you read the ESCO rules yourself?
Go to the Energy Commission’s own pages.
The Energy Commission publishes the ESCO certificate list on its MySTEE portal and the Energy Efficiency and Conservation Act 2024 on st.gov.my. On 26 Nov 2026 MySTEE showed 16 active ESCO certificates. Its helpdesk at helpdesk.mystee@st.gov.my takes questions about the list, as the portal states.
Each source answers a different question:
- the certified ESCOs, with numbers and dates: the MySTEE ESCO certificate list;
- the older list of 409 names: the List of Energy Service Company on st.gov.my;
- the Act and what it asks of an energy consumer: the Energy Commission’s EECA 2024 page;
- the Act, regulations and guidelines in full: the Commission’s legislation page.
For a plain summary of the Act, read the EECA 2024 guide. Questions about the ESCO list can go to the Energy Commission’s MySTEE helpdesk at helpdesk.mystee@st.gov.my, as the portal lists (read 26 Nov 2026).