EMEER 2008 no longer applies in Peninsular Malaysia. Many engineers still search for EMEER 2008, the Efficient Management of Electrical Energy Regulations 2008, because it shaped energy management on their sites for years.
The Energy Commission says EMEER 2008 was repealed on 1 January 2025, the day the Energy Efficiency and Conservation Act 2024 (Act 861) came into force (Energy Commission, EECA 2024 page, read 26 Nov 2026).
This guide sets out what the old rule was, what replaced it, how to check your site against the new line, and what happens to certificates issued under it. It ends with the one place an EMEER still exists: Sabah.
What was EMEER 2008?
The short answer is an old electricity rule.
EMEER 2008 is a set of regulations that governed how large users of electricity managed their electrical energy. It was made under the Electricity Supply Act 1990 (Act 447), and the Energy Commission says it was repealed on 1 January 2025, when the Energy Efficiency and Conservation Act 2024 came into force.
The full name was the Efficient Management of Electrical Energy Regulations 2008. As the name says, it dealt with electrical energy only. Gas, steam and other fuels sat outside it.
The role it named was the electrical energy manager. People often wrote this as REEM, for Registered Electrical Energy Manager. That registration was made under the Electricity Supply Act 1990.
The old rule no longer decides whether a site in Peninsular Malaysia or Labuan is covered. The new Act does, and the rest of this guide explains how.
Why people still search for it
Three groups still look up EMEER 2008:
- facility and engineering heads who appointed an electrical energy manager under the old rule and want to know if that still counts;
- engineers who hold an old electrical energy manager certificate and want to know what it is worth now;
- consultants and students reading older reports, tenders or course notes that still cite the 2008 rule.
Each group has a clear answer under the new Act. The sections below give it.
Does EMEER 2008 still apply, and what replaced it?
No. The EECA 2024 replaced it.
EMEER 2008 no longer applies in Peninsular Malaysia or Labuan. The Energy Commission says the Energy Efficiency and Conservation Act 2024 replaced it on 1 January 2025. Under regulation 3 of P.U.(A) 466/2024, a site is now covered when it uses 21,600 GJ or more of energy in 12 consecutive months.
The big change is the unit. The old rule looked at electricity. The new Act looks at energy, which means every listed fuel and energy type, turned into gigajoules (GJ) and added together.
The Act applies to Peninsular Malaysia and the Federal Territory of Labuan (section 1(3)). It does not reach Sabah or Sarawak.
The old rule beside the new one
| EMEER 2008 | EECA 2024 | |
|---|---|---|
| Status | Repealed 1 January 2025 | In force since 1 January 2025 |
| Made under | Electricity Supply Act 1990 | Energy Efficiency and Conservation Act 2024 (Act 861) |
| What is counted | Electricity | Electricity, chilled water, steam, hot water and the energy resources in the Act’s First Schedule, added in GJ |
| Line | An electricity test | 21,600 GJ in 12 consecutive months (regulation 3) |
| Role to appoint | Electrical energy manager | Registered Energy Manager, first or second type |
| Who decides you are covered | Not restated here | The Energy Commission, by written notice (sections 3(2) and 3(3)) |
| Penalty for not appointing a manager | Not restated here | Fine up to RM50,000 on conviction (section 5(3)) |
What counts toward the 21,600 GJ
What counts is what the Act’s two schedules list. The Second Schedule lists the energy: electricity, chilled water, steam and hot water.
The First Schedule lists the energy resources. These include coal and coke types, LNG, butane, propane, natural gas, ethane, methane, solar photovoltaic and solar thermal, biogas, biodiesel, charcoal and the palm and wood fuels.
Petrol and diesel are on neither list. So the diesel in a standby generator or a forklift does not go into the total.
The Commission’s Guidelines on Ascertaining Energy Consumer (amended 10 July 2026, read 26 Nov 2026) also leave some energy out. Energy passed on to tenants who control their own use, fuel used as a feedstock, energy made from waste heat recovery and solar power exported to the grid are not counted.
How do you check your site against the new 21,600 GJ line?
Add a year of bills in GJ, then compare.
To check your site, take 12 consecutive months of energy use, convert each type to GJ and add them up. The Energy Commission’s Guidelines on Ascertaining Energy Consumer set the coefficients, such as 0.0036 GJ per kWh of electricity and 1.055 GJ per MMBtu of natural gas. A total of 21,600 GJ or more is over the line.
The method is simple. The care goes into finding every meter and every fuel bill.
The coefficients you will use most
These are from Appendix A of the Commission’s guideline, as restated on the guide to the Act:
| Energy or fuel | Coefficient |
|---|---|
| Electricity | 0.0036 GJ per kWh |
| Natural gas | 1.055 GJ per MMBtu, or 0.047233 GJ per m3 |
| LPG | 0.045544 GJ per kg |
| Chilled water bought in | 0.01266 GJ per RTh |
| Steam at 10 bar | 2.7771 GJ per tonne |
| Biodiesel | 0.03564 GJ per litre |
| Palm kernel shell | 20.1 GJ per tonne |
| Solar photovoltaic | 0.0036 GJ per kWh |
The electricity figure comes from physics. One kWh is 3.6 MJ, and 1,000 MJ is 1 GJ, so 1 kWh is 0.0036 GJ.
Worked example 1: electricity only
On electricity alone, 21,600 GJ divided by 0.0036 is 6,000,000 kWh in 12 months. That is 500,000 kWh a month on average.
The second line, at 50,000 GJ, is about 13,890,000 kWh of electricity a year. Above it, a site needs a second type Registered Energy Manager (regulation 5).
Worked example 2: the Commission’s Factory A
The guideline’s own example is Factory A. In 2025 it used 8,323,446 kWh of electricity, which is 29,964.41 GJ.
It also used 17,287 MMBtu of natural gas, which is 18,237.79 GJ. The total is 48,202.19 GJ. Factory A is over 21,600 GJ and under 50,000 GJ, so a first type manager is enough.
Worked example 3: a plant that only watched its power bills
Take a plant that uses 5,000,000 kWh of electricity a year. That is 5,000,000 × 0.0036 = 18,000 GJ. On power alone, it is under the line.
Now add 100,000 kg of LPG for its ovens. That is 100,000 × 0.045544 = 4,554.4 GJ. The total is 22,554.4 GJ, so the plant is over 21,600 GJ.
If the same plant also ran diesel generators, that diesel would not change the sum. Diesel is on neither of the Act’s lists.
What else changes the count
- One place. The use is counted for an activity carried out in one place (section 3(5)).
- Related companies. Two plants of related companies in the same compound may be counted as one energy consumer, according to the guideline. Plants separated by another owner’s factory stay separate.
- Tenants. A building owner who passes power to tenants who control their own use counts net of what goes out.
The converter on the home page does this sum for you from a year of bills.
What does the EECA 2024 ask that EMEER 2008 did not?
Fixed deadlines, an audit and set fines.
The EECA 2024 ties every duty to the Energy Commission’s written notice. Under regulations 4 to 10 of P.U.(A) 466/2024, a site must appoint a Registered Energy Manager within 3 months, build an energy management system within 1 year of that appointment, and send in a first energy audit report within 1 year of the notice.
The clock starts on the day the Energy Commission’s notice arrives. Nothing is due before that notice, and every date runs from it.
Duties and deadlines
| Duty | Due | Where it is set |
|---|---|---|
| Appoint a Registered Energy Manager and tell the Commission | within 3 months of the notice | regulation 4 |
| Develop an energy management system | within 1 year of the first manager’s appointment | regulation 8 |
| First energy audit report, by a Registered Energy Auditor | within 1 year of the notice, then every 5 years | regulation 10 |
| Energy efficiency and conservation report | within 30 days after the first year from the manager’s appointment, then every year | regulation 9 |
| Tell the Commission the manager has left | within 14 days, and appoint a new one within 3 months | regulation 7 |
The Commission’s own example: a notice dated 1 January 2026 means the energy manager is due by 31 March 2026.
Who the manager can be
The manager is normally one of your own employees (regulation 4). A manager from outside is allowed for up to 3 years from the notice. After that, the site must appoint one of its own (regulation 6).
Sites between 21,600 and 50,000 GJ need a first type manager. Sites above 50,000 GJ need a second type (regulation 5). Hiring a Registered Energy Manager explains both.
The manager must also be on the register and hold a valid practising certificate. Section 25 of the Act makes it an offence to do the Act’s duties without them, with a fine of up to RM20,000.
The fines
Not appointing a manager, not having an energy management system, not appointing an auditor, and not sending either report can each bring a fine of up to RM50,000 on conviction (sections 5(3), 6(3), 7(4), 8(4) and 9(10) of the Act).
The Commission may offer to compound an offence for up to half the maximum fine (section 61). When a company offends, its directors, managers and similar officers can be charged too (section 62).
The audit and the yearly report
The first audit must be done by a Registered Energy Auditor. You can look up auditors on the Commission’s list of Registered Energy Auditors. See the energy audit for what it covers.
The yearly energy efficiency and conservation report follows the Commission’s Guidelines on Energy Efficiency and Conservation Report (issued 13 November 2026). It describes the energy management system, the energy used and for what, and the measures done and still to do (section 7(1)).
For a day-by-day walk through the first three months, read the day the notice arrives.
Not sure where your site sits against 21,600 GJ? Ask for a price through the form. One year of bills is enough to start.
What happens to a registered electrical energy manager certificate?
It still counts, for a while.
A registered electrical energy manager certificate from the old rule still counts until it expires. Section 71 of the EECA 2024 treats a valid certificate issued under the Electricity Supply Act 1990 as Registered Energy Manager status, provided the holder has applied to register under the new Act. Regulation 14(3) adds a route to second type status.
Two provisions deal with electrical energy managers registered before 2025.
Section 71(1) of the Act
A person holding a valid certificate of registration as an electrical energy manager under the Electricity Supply Act 1990 is treated as a Registered Energy Manager under the EECA. This lasts until that certificate expires.
There is one condition. The holder must have applied to register as an energy manager under the new Act.
Regulation 14(3)
Until the old certificate expires, its holder may apply to be a second type Registered Energy Manager by sitting an assessment set by the Commission.
This matters because the second type is the one a site above 50,000 GJ must appoint (regulation 5). For anyone else, reaching the second type normally means at least 1 year as a first type manager, plus the second type training and assessment (regulation 14(2)).
What this means in practice
A manager with an old certificate can keep working for the site. But the old certificate has an end date, and the new register does not fill itself in.
So the holder should apply under the new Act well before the certificate runs out. The application goes through the Commission’s MySTEE portal. The forms are linked from the Commission’s energy manager and auditor registration page.
The fees for a new registration are RM30 to apply, RM100 for the certificate of registration, RM30 to apply for the practising certificate and RM100 for its issue. That is RM260 in all, before any training fees.
The full route is in becoming a certified energy manager. The training side is in energy manager training.
A short worked case
Say a plant’s electrical energy manager holds a valid old certificate. The plant uses 60,000 GJ a year, so it needs a second type manager.
The holder applies under the EECA and is treated as a Registered Energy Manager until the old certificate expires (section 71). Before that date, the holder can sit the Commission’s assessment to be a second type manager (regulation 14(3)). If the certificate lapses first, that shortcut is gone.
Does an EMEER still apply in Sabah?
Yes. Sabah has its own 2024 rule.
Yes. Sabah has its own Efficient Management of Electrical Energy Regulations 2024, made under the Electricity Supply Enactment 2024 and in force from 3 January 2024. The Energy Commission of Sabah applies them to installations using 3,000,000 kWh or more over any period of up to six consecutive months (regulation 3).
The EECA does not reach Sabah or Sarawak (section 1(3)). Sabah regulates its own electricity through the Energy Commission of Sabah (ECoS). It kept a rule with the old name (read on ecos.gov.my, 26 Nov 2026).
Who the Sabah rule covers
Under regulation 3 of the Sabah rule, it applies to:
- an installation that receives electricity from a licensee and uses 3,000,000 kWh or more, measured at one metering point or more, over any period of up to six consecutive months; or
- an installation run by a private installation licensee whose net generation reaches 3,000,000 kWh over the same kind of period.
For scale, 3,000,000 kWh is 10,800 GJ at 3.6 MJ per kWh. But Sabah does not count in GJ. Its test is electricity, measured over a period of up to six months.
What ECoS may ask
ECoS may direct the site to appoint or designate a registered electrical energy manager. The site then confirms the appointment within three months of the notice (regulations 6 and 7).
The site also sends in a policy, objectives and a signed report every six months (regulations 6 and 7).
ECoS keeps its own list of registered electrical energy managers (EREEM) and of energy service companies (EESCO). An EESCO must be a Sabah-based company employing a full-time registered electrical energy manager (ECoS EREEM and EESCO page, read 26 Nov 2026).
Peninsular and Sabah side by side
| Peninsular Malaysia and Labuan | Sabah | |
|---|---|---|
| Rule | EECA 2024 (Act 861) and P.U.(A) 466/2024 | Efficient Management of Electrical Energy Regulations 2024 |
| Regulator | Energy Commission (Suruhanjaya Tenaga) | Energy Commission of Sabah (ECoS) |
| What is counted | All listed energy, in GJ | Electricity, in kWh |
| Line | 21,600 GJ in 12 consecutive months | 3,000,000 kWh over up to six consecutive months |
| Role | Registered Energy Manager | Registered electrical energy manager |
| Manager deadline | 3 months from the notice | 3 months from the notice |
A company with plants in both places works to both rules. Its Sabah plant deals with ECoS, not with the Energy Commission in Putrajaya.
What should a site that was under EMEER 2008 do now?
Start from the notice, then the numbers.
A site that was under EMEER 2008 should find any Energy Commission notice, since its date starts every EECA deadline. Then it should add all listed energy in GJ, check the 21,600 GJ and 50,000 GJ lines in regulations 3 and 5, and confirm its old manager has applied under section 71.
Five steps
- Find the notice. Look for the Energy Commission’s EECA notice, if one has been sent. Its date starts every deadline.
- Check the old certificate. Note the expiry date of the electrical energy manager certificate. Make sure the holder has applied under the EECA (section 71).
- Redo the sum in GJ. Add gas, LPG, steam and chilled water to the electricity total. See whether the site is between 21,600 and 50,000 GJ (first type) or above 50,000 GJ (second type).
- Plan the first audit. A Registered Energy Auditor’s report is due within a year of the notice. See the energy audit.
- Set up the yearly report. It falls due within 30 days after the first year from the manager’s appointment, then every year (regulation 9).
What to have ready
- 12 consecutive months of electricity bills, from every incoming meter;
- bills for natural gas, LPG, steam, chilled water and any other listed fuel;
- the old electrical energy manager certificate, with its expiry date;
- the name of the person who will be the Registered Energy Manager, and whether they are staff or from outside;
- any letter or notice already received from the Energy Commission.
Common mistakes
- Reading only the power bill. The old habit was to look at kWh. Under the EECA, gas, LPG, steam and chilled water count too.
- Adding diesel. Diesel and petrol are on neither of the Act’s lists. Leave them out of the total.
- Assuming the old certificate lasts. Section 71 only covers a certificate until it expires, and only if the holder has applied under the new Act.
- Missing the shortcut. An old certificate holder who needs second type status should sit the assessment before the certificate expires (regulation 14(3)).
- Using an outside manager for good. An outside manager is allowed for up to 3 years from the notice (regulation 6).
- Treating Sabah like the Peninsula. A Sabah plant follows the ECoS rule, not the EECA.
Objections people raise
“We were never under EMEER, so we are fine.” Not always. A site that used little electricity but burns gas can be over 21,600 GJ.
“We have not received a notice, so we can wait.” Duties run from the notice, so nothing is due yet. But the sum and the manager search take time, and the first deadline is only 3 months.
“Our old manager is still registered.” Only until the old certificate expires, and only if they have applied under the EECA.
Where can you read the EMEER and EECA rules yourself?
On the two regulators’ own websites.
You can read the rules on the regulators’ own sites. The Energy Commission’s EECA 2024 page on st.gov.my holds Act 861, P.U.(A) 466/2024 and the guidelines. The Energy Commission of Sabah lists its 2024 electricity regulations on ecos.gov.my. Both pages were read on 26 Nov 2026 for this guide.
- The Energy Commission’s EECA 2024 page holds the Act, the regulations and the guidelines, including the Guidelines on Ascertaining Energy Consumer.
- The Commission’s legislation page is another way in to the same texts.
- The energy manager and auditor registration page links the MySTEE forms.
- Sabah’s regulations are on the ECoS regulations page.
For the full EECA picture, start with the guide to the Act.